The acquisitions include:
- Nearly 400 gensets – both nosemounts and underslungs – which will begin arriving in Jacksonville, Fla. between July and September.
- 700 45-foot (102-inch-wide) dry containers and 525 40-45-foot extendable chassis, all expected in Jacksonville no later than the end of September.
- 500 53-foot (102-inch-wide) dry containers; 500 53-foot chassis; 325 20-foot chassis and 1,360 40-foot chassis, all slated for delivery by November.
- High-cube containers including 75 40-foot refrigerated containers, which will be delivered in Limon, Costa Rica, by late September in advance of the heavy Central America reefer season.