The dredging and filling is necessary for the redevelopment and consolidation of two existing container terminals in the context of a 342-acre marine terminal. The construction for the marine terminal involves redevelopment of 294 acres of existing land, and the placement of dredged material in open water to create 48 acres of new land.
'The primary reason for the revised notice of intent is because the proposed terminal expansion project has been modified to utilize additional existing land to reduce the amount of fill in open water by approximately 20 acres,' the Corps said in a statement.
The Corps is requiring the preparation of an environmental impact statement prior to consideration of any permit action.
The Port of Long Beach is serving as the lead agency for preparing a second environmental impact report required under California law.
After considering both reports, the Corps of Engineers 'may ultimately determine to permit or deny the [revised] project, or any modified versions of it,' the Corps explained.
For more information, call Aaron P. Allen, (805) 585-2148. Comments and questions about the scope of the draft environmental reports may be addressed to the U.S. Army Corps of Engineers, Regulatory Branch, Los Angeles District, File No. 2004-01053-AOA, P.O. Box 532711, Los Angeles, Calif., 90053-2325.
Brokerage Compliance Symposium
The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.
F3 Awards Dinner
The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.
F3: Future of Freight Festival
Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.
The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.
The Signal at Chattanooga Choo Choo • Chattanooga, TN Register NowThe night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.
The Signal at Chattanooga Choo Choo • Chattanooga, TN Register NowIndustry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.
The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now