CSX’s Q3 net earnings, revenues drop amid lower volumes

The Class 1 railway’s earnings per share for the quarter surpassed analyst expectations, reaching $0.48 per share, but were still lower than the $0.52 per share for the third quarter of 2015.    CSX Corporation said Wednesday its net earnings for the third quarter of 2016 totaled $455 million, a 10 percent decline from the third quarter of 2015.
   The Jacksonville, Fla.-based Class 1 railway’s earnings per share (EPS) surpassed analyst expectations, reaching $0.48 per share for the third quarter, but the result was still down from $0.52 per share for the third quarter of 2015. On average, analysts expected CSX’s EPS for the third quarter of this year to total $0.45 per share, Reuters said.
   Meanwhile, CSX’s revenues for the quarter tumbled 8 percent year-over-year to $2.7 billion, consistent with an 8 percent decline in overall volumes, including a 21 percent drop in coal volumes.
   However, the railway managed to decrease total expenses 7 percent year-over-year to $1.9 billion, primarily driven by efficiency gains of $112 million and volumes related cost reductions of $53 million.
   CSX’s operating ratio for the quarter totaled 69 percent compared to 68.3 percent for the third quarter of 2015.
   “While the U.S. dollar strength and low global commodity prices persisted in the quarter, CSX is positioning itself to maximize shareholder value by leveraging network improvements, technology enhancements and superior service to capture growth opportunities and achieve a mid-60s operating ratio longer term,” CSX said.
   CSX said Wednesday in its latest update regarding the aftermath of Hurricane Matthew that it has resumed normal train operations to Savannah, Ga.; Charleston, S.C.; and Portsmouth, Va. The railway also said Wednesday it anticipated the main line from Hamlet, S.C. to Charleston, S.C. would be back in service that night.
   The railway also issued a restoration schedule Wednesday, which said:
     • Columbia, S.C. to Charleston, S.C. branch lines are anticipated to be back in service by Friday evening;
     • The W&W sub line is expected to be back in service by Saturday evening;
     • The Wilmington sub line has experienced washout conditions along several sections of the track and CSX anticipates it will be seven to ten days for repairs to be completed;
     • The north end of the Andrews sub line between Andrews, S.C. and Dillon, S.C. is expected to be operational in a week to 10 days;
     • The Pennyroyal, S.C. and Georgetown, S.C. areas are still being evaluated with the repair timetable still to be determined;
     • The Tarboro and Parmele sub lines are still being evaluated with the repair timetable still to be determined;
     • And the Fort Bragg spur’s repairs are expected to be completed in seven to 10 days.
Upcoming FreightWaves Events
Compliance

Brokerage Compliance Symposium

The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.

October 26, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
Awards

F3 Awards Dinner

The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.

October 26, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
FreightTech

F3: Future of Freight Festival

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

October 27, 2026 – October 28, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
Compliance Brokerage Compliance Symposium Oct 26 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now
Awards F3 Awards Dinner Oct 26 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now
FreightTech F3: Future of Freight Festival Oct 27 – Oct 28 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now