• ITVI.USA
    16,240.330
    -110.510
    -0.7%
  • OTLT.USA
    2.762
    0.031
    1.1%
  • OTRI.USA
    21.780
    0.120
    0.6%
  • OTVI.USA
    16,233.310
    -109.890
    -0.7%
  • TSTOPVRPM.ATLPHL
    3.520
    0.380
    12.1%
  • TSTOPVRPM.CHIATL
    2.960
    -0.660
    -18.2%
  • TSTOPVRPM.DALLAX
    1.610
    0.250
    18.4%
  • TSTOPVRPM.LAXDAL
    3.340
    -0.130
    -3.7%
  • TSTOPVRPM.PHLCHI
    2.100
    -0.250
    -10.6%
  • TSTOPVRPM.LAXSEA
    3.860
    -0.220
    -5.4%
  • WAIT.USA
    126.000
    -2.000
    -1.6%
  • ITVI.USA
    16,240.330
    -110.510
    -0.7%
  • OTLT.USA
    2.762
    0.031
    1.1%
  • OTRI.USA
    21.780
    0.120
    0.6%
  • OTVI.USA
    16,233.310
    -109.890
    -0.7%
  • TSTOPVRPM.ATLPHL
    3.520
    0.380
    12.1%
  • TSTOPVRPM.CHIATL
    2.960
    -0.660
    -18.2%
  • TSTOPVRPM.DALLAX
    1.610
    0.250
    18.4%
  • TSTOPVRPM.LAXDAL
    3.340
    -0.130
    -3.7%
  • TSTOPVRPM.PHLCHI
    2.100
    -0.250
    -10.6%
  • TSTOPVRPM.LAXSEA
    3.860
    -0.220
    -5.4%
  • WAIT.USA
    126.000
    -2.000
    -1.6%
American Shipper

Corps concludes environmental study for Long Beach’s Pier J

Corps concludes environmental study for Long Beach’s Pier J

   The U.S. Army Corps of Engineers said it has completed a final environmental analysis for the Port of Long Beach’s Pier J marine terminal expansion project.

   The project involves 115 acres of landfill, up to 10 million cubic yards of dredge material, construction of a new concrete wharf, new terminal buildings and a new rail yard.

   For more details about the report, contact Aaron O. Allen of the Corps of Engineers at (805) 585-2148.

We are glad you’re enjoying the content

Sign up for a free FreightWaves account today for unlimited access to all of our latest content

By signing in for the first time, I give consent for FreightWaves to send me event updates and news. I can unsubscribe from these emails at any time. For more information please see our Privacy Policy.