Crane collapses at Port of Vancouver after hit by vessel

No injuries were reported in the incident, which occurred early Monday morning, but both the crane and Evergreen ship sustained damage.    Canadian investigators are looking into a gantry crane that collapsed early Monday morning at the Port of Vancouver and fell onto an Evergreen Liner containership at Global Container Terminals (GCT) Vanterm.
   A statement from the Transportation Safety Board (TSB) said the ship — the 7,024-TEU containership Ever Summit — struck the ship-to-shore crane while berthing and both the vessel and crane sustained damage. In a statement, Evergreen Line said the incident, which occurred about 4 a.m., “partly crushed some containers on the vessel’s deck,” but there were no injuries at the scene or environmental pollution at the port.
   The cause of the accident is under investigation by concerned parties, read Evergreen Line’s statement. The TSB is an independent agency that aims to advance transportation safety and does not assign fault or determine civil or criminal liability.
   Two tugboats were holding the ship against the dock to prevent it from shifting, which could cause more possible damage, said GCT spokeswoman Louanne Wong, according to The Canadian Press. 
   “The cranes themselves are very expensive. It could be upwards of $50 million,” said Joe Spears, managing director of Horseshoe Bay Marine Group, in a report by Global News Canada. “There’s the damage to the ship. There’s the delay of the ship, the delay of the dock.” 
   Truck and rail operations remained active Monday, Wong said, but vessel operations were shut down and an exclusion zone was set up to manage the scene.
   No other operations outside of the terminal were impacted, Danielle Jang of the Port of Vancouver said in a statement per The Canadian Press. The port authority is providing incident support to ensure work resumes safely and efficiently, she said.
   “As soon as the damaged crane is removed and the terminal is safe, the containership will begin cargo-handling operation, undergo full inspection and receive necessary repairs,” the statement from Evergreen Line read.
   But the removal of the crane could be time consuming, Spears said.
   “To get that off there you’re probably going to have to bring in a large floating crane or a shore-based crane,” Spears said in the report. “A container crane can only lift 40 tons, so you’re going to have to cut that up, but that might be weeks.”

Upcoming FreightWaves Events
Compliance

Brokerage Compliance Symposium

The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.

October 26, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
Awards

F3 Awards Dinner

The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.

October 26, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
FreightTech

F3: Future of Freight Festival

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

October 27, 2026 – October 28, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
Compliance Brokerage Compliance Symposium Oct 26 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

The day before F3. Every compliance issue you face - fraud exposure, carrier liability, FMCSA rules, cargo theft, insurance gaps - navigated by attorneys and operators defining best practices in a changing industry.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now
Awards F3 Awards Dinner Oct 26 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

The night before F3. FreightTech100 companies honored. FreightTech 25 and Shipper of Choice winners revealed live. Cocktail reception into dinner and live music - 300 industry leaders in one purpose-built room.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now
FreightTech F3: Future of Freight Festival Oct 27 – Oct 28 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now