LA port terminal getting $52 million for on-dock rail

Feds, state and port financing upgrade project

Pier 300, Port of Los Angeles. (Photo: Port of Los Angeles)

The U.S. container port arms race is moving by rail.

The Los Angeles Harbor Commission on Thursday said it has approved a lease amendment that finalizes plans for $52 million to improve the on-dock rail capacity at the Port of Los Angeles Pier 300.

Pier 300, the second-largest terminal at Los Angeles, is owned by CMA CGM Group of Marseille and operated by subsidiary Fenix Marine Services (FMS). Construction is expected to begin in 2025, the port said in a release, and will add five loading/unloading tracks in the intermodal yard.

“This project enhances cargo capacity and efficiency while improving the sustainability of port operations,” said Los Angeles Harbor Commission President Lucille Roybal-Allard in the announcement. “It’s yet another step forward toward both our productivity and clean air goals.”

The terminal currently has eight on-dock rail tracks with overall capacity of 64 five-well double-stack railcars, and adjacent storage for 74 railcars. It is accessible to both BNSF and Union Pacific railroads. Annual capacity is over 1 million lifts. 

“Fewer transfers of cargo results in cleaner operations and more fluidity on our container terminals,” said Port of Los Angeles Executive Director Gene Seroka. “This project will make us more competitive and add to our ability to pursue more discretionary cargo headed for the interior of the United States.”

Other improvements include grading and paving, fire protection, electrical improvements, striping and signage, and additional storm drain design elements for Low Impact Development compliance.

“This investment ensures that there is adequate on-dock intermodal capacity to accommodate future volume growth, enabling POLA and FMS to further compete for discretionary cargo in an environmentally and community-responsible way,” said George Goldman, president and CEO of CMA CGM (America), in the announcement.

Pier 300 is the latest in a series of rail improvement projects aimed at ensuring the Los Angeles-Long Beach port complex remains the top gateway for U.S.-bound containerized imports. In July the port completed a $73 million on-dock expansion at LA’s Pier 400, and Long Beach broke ground on a $1.56 billion upgrade that will triple its on-dock TEU capacity and more than double the number daily double-stack train departures. 

Grant funding for the project includes approximately $18 million from the U.S. Department of Transportation Maritime Administration and $19 million from California’s Trade Corridor Enhancement Program. The port will provide the balance of the funding.  

In January 2022, CMA CGM reacquired Fenix Marine Services for $2.3 billion. Pier 300 accounts for more than 2.5 million twenty-foot equivalent units, or 20%, of the port’s total volume.

Upcoming FreightWaves Events
AI

Supply Chain AI Symposium

Past the hype. Join operators, founders, and enterprise leaders figuring out how to deploy AI in supply chain.

July 15, 2026
The Old Post • Chicago, IL
Register Now
Rail

Future of Rail Symposium

Reshoring is rewriting freight demand. Join shippers, rail executives, and government officials to shape the next decade.

July 28, 2026
The Signal at Chattanooga Choo Choo • Chattanooga TN
Register Now
FreightTech

F3: Future of Freight Festival

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

October 27, 2026 – October 28, 2026
The Signal at Chattanooga Choo Choo • Chattanooga, TN
Register Now
AI Supply Chain AI Symposium Jul 15 • The Old Post • Chicago, IL

Past the hype. Join operators, founders, and enterprise leaders figuring out how to deploy AI in supply chain.

The Old Post • Chicago, IL Register Now
Rail Future of Rail Symposium Jul 28 • The Signal at Chattanooga Choo Choo • Chattanooga TN

Reshoring is rewriting freight demand. Join shippers, rail executives, and government officials to shape the next decade.

The Signal at Chattanooga Choo Choo • Chattanooga TN Register Now
FreightTech F3: Future of Freight Festival Oct 27 – Oct 28 • The Signal at Chattanooga Choo Choo • Chattanooga, TN

Industry-defining keynotes, rapid-fire technology demos, and industry leaders networking in experiences across Chattanooga - plus the inaugural F3 Awards Dinner featuring the FreightTech and Shipper of Choice reveals.

The Signal at Chattanooga Choo Choo • Chattanooga, TN Register Now

Stuart Chirls

Stuart Chirls is a journalist who has covered the full breadth of railroads, intermodal, container shipping, ports, supply chain and logistics for Railway Age, the Journal of Commerce and IANA. He has also staffed at S&P, McGraw-Hill, United Business Media, Advance Media, Tribune Co., The New York Times Co., and worked in supply chain with BASF, the world's largest chemical producer. Reach him at stuartchirls@firecrown.com.